{"id":13707,"date":"2024-11-29T10:54:48","date_gmt":"2024-11-29T09:54:48","guid":{"rendered":"https:\/\/reri.org.rs\/urgently-stop-the-illegal-demolition-of-the-old-sava-bridge\/"},"modified":"2025-03-28T11:03:13","modified_gmt":"2025-03-28T10:03:13","slug":"urgently-stop-the-illegal-demolition-of-the-old-sava-bridge","status":"publish","type":"post","link":"https:\/\/reri.org.rs\/en\/urgently-stop-the-illegal-demolition-of-the-old-sava-bridge\/","title":{"rendered":"Urgently stop the illegal demolition of the Old Sava Bridge"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"13707\" class=\"elementor elementor-13707 elementor-13390\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-78c59c12 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"78c59c12\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-extended\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-1eaaf09 sc_layouts_column_icons_position_left\" data-id=\"1eaaf09\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-1b5635d5 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"1b5635d5\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><b><i>The removal of the Old Sava Bridge, which causes great dissatisfaction among citizens, is being carried out without an environmental impact assessment (EIA). Permits for the demolition of the Old and the construction of the New Sava Bridge were issued in violation of current regulations, and there is a reasonable doubt that an official of the Ministry of Environmental Protection committed the criminal offences of falsifying an official document and of misconduct in public office, by providing incorrect information that enabled investors to obtain permits.<\/i><\/b><\/p><p><span style=\"font-weight: 400;\">After several decades of neglect of the Old Sava Bridge, turning off the lights that removed it from the recognizable night view of the city and even labeling it as \u201cNazi\u201d and \u201cfascist\u201d, the national and city authorities commenced to demolish it. The absence of official information was replaced by political speculation, while police cordons are placed in front of citizens who are seeking responses from competent institutions. Illegalities, non-transparency and exclusion of citizens from the decision-making process, along with increasingly frequent scenes of violence, have become the manner of implementing capital\u00a0 projects in Serbia.<\/span><\/p><p><b>A timeline of a demolition:<\/b><\/p><p>\u00a0<\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-52ab7b0 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"52ab7b0\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-extended\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2bb27f4 sc_layouts_column_icons_position_left\" data-id=\"2bb27f4\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-f2b842d sc_fly_static elementor-widget elementor-widget-image\" data-id=\"f2b842d\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a href=\"https:\/\/reri.org.rs\/wp-content\/uploads\/2025\/03\/Savski-most-RERI-en.png\" data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-title=\"Savski-most-RERI-en\" data-e-action-hash=\"#elementor-action%3Aaction%3Dlightbox%26settings%3DeyJpZCI6MTM3MTAsInVybCI6Imh0dHBzOlwvXC9yZXJpLm9yZy5yc1wvd3AtY29udGVudFwvdXBsb2Fkc1wvMjAyNVwvMDNcL1NhdnNraS1tb3N0LVJFUkktZW4ucG5nIn0%3D\">\n\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1800\" height=\"604\" src=\"https:\/\/reri.org.rs\/wp-content\/uploads\/2025\/03\/Savski-most-RERI-en.png\" class=\"attachment-full size-full wp-image-13710\" alt=\"Old Sava Bridge demolition timeline\" srcset=\"https:\/\/reri.org.rs\/wp-content\/uploads\/2025\/03\/Savski-most-RERI-en.png 1800w, https:\/\/reri.org.rs\/wp-content\/uploads\/2025\/03\/Savski-most-RERI-en-400x134.png 400w, https:\/\/reri.org.rs\/wp-content\/uploads\/2025\/03\/Savski-most-RERI-en-1024x344.png 1024w, https:\/\/reri.org.rs\/wp-content\/uploads\/2025\/03\/Savski-most-RERI-en-768x258.png 768w, https:\/\/reri.org.rs\/wp-content\/uploads\/2025\/03\/Savski-most-RERI-en-1536x515.png 1536w, https:\/\/reri.org.rs\/wp-content\/uploads\/2025\/03\/Savski-most-RERI-en-370x124.png 370w, https:\/\/reri.org.rs\/wp-content\/uploads\/2025\/03\/Savski-most-RERI-en-760x255.png 760w, https:\/\/reri.org.rs\/wp-content\/uploads\/2025\/03\/Savski-most-RERI-en-387x130.png 387w, https:\/\/reri.org.rs\/wp-content\/uploads\/2025\/03\/Savski-most-RERI-en-500x168.png 500w\" sizes=\"(max-width: 1800px) 100vw, 1800px\" \/>\t\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-4dc0d41 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"4dc0d41\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-extended\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2114b1b sc_layouts_column_icons_position_left\" data-id=\"2114b1b\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-0da5eac sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"0da5eac\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><b>23 February 2021<\/b><\/p><p><span style=\"font-weight: 400;\">The Ministry of Environmental Protection <\/span><b>approves<\/b><span style=\"font-weight: 400;\"> the EIA study for the project of construction of a new bridge on the site of the Old Sava Bridge. The consent is valid for <\/span><b>two years,<\/b><span style=\"font-weight: 400;\"> and the study <\/span><b>does not include the demolition of the old bridge.<\/b><span style=\"font-weight: 400;\">\u00a0<\/span><\/p><p><b>9 August 2022<\/b><\/p><p><span style=\"font-weight: 400;\">The Ministry of Environmental Protection <\/span><b>rejects the EIA screening request<\/b><span style=\"font-weight: 400;\"> for the demolition of the Old Sava Bridge, <\/span><b>incorrectly stating<\/b><span style=\"font-weight: 400;\"> that its demolition is already included in the Study for the new bridge.<\/span><\/p><p><b>14 February 2023<\/b><\/p><p><span style=\"font-weight: 400;\">The Ministry of Environmental Protection <\/span><b>informs<\/b><span style=\"font-weight: 400;\"> the investor that the approval of the study for the new bridge is valid until the end of 2023, even though the validity of the approval <\/span><b>cannot be extended<\/b><span style=\"font-weight: 400;\"> in this manner.<\/span><\/p><p><b>12 December 2023<\/b><\/p><p><span style=\"font-weight: 400;\">Although the EIA approval for the new bridge has <\/span><b>expired<\/b><span style=\"font-weight: 400;\">, the Ministry of Environmental Protection <\/span><b>informs<\/b><span style=\"font-weight: 400;\"> the investor that it is still <\/span><b>valid<\/b><span style=\"font-weight: 400;\"> and that until the end of 2024 it can be used to obtain construction permits.<\/span><\/p><p><b>19 September 2024<\/b><\/p><p><span style=\"font-weight: 400;\">Despite the fact that the removal of the Old Sava Bridge clearly represents <\/span><b>preparatory work<\/b><span style=\"font-weight: 400;\"> for the construction of a new bridge, the Ministry of Construction, Transport and Infrastructure <\/span><b>does not issue a building permit for preparatory work<\/b><span style=\"font-weight: 400;\">, but a special permit for the demolition of the old bridge. A demolition permit, unlike a construction permit, <\/span><b>is not publicly available.<\/b><\/p><p><b>16 October 2024<\/b><\/p><p><span style=\"font-weight: 400;\">For the purpose of constructing the new bridge on the site of the Old Sava Bridge, the Ministry of Construction, Transport and Infrastructure issued a construction permit. Demolition of the old bridge <\/span><b>is not part of the planned works.<\/b><\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-ed3311a elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"ed3311a\" data-element_type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-extended\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-55a5fed sc_layouts_column_icons_position_left\" data-id=\"55a5fed\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-88fbe66 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"88fbe66\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><b>What is illegal about demolition of the bridge?<\/b><\/p>\n<ol>\n<li><span style=\"font-weight: 400;\">At the time of issuing the permit for the demolition of the old bridge and the construction permit for the new bridge<\/span><b>, the validity of the approval of the study for the new bridge expired<\/b><span style=\"font-weight: 400;\">, which is why the permits should not have been issued;<\/span><\/li>\n<li><span style=\"font-weight: 400;\">The civil servant working in the Ministry of Environmental Protection on two occasions issued an incorrect notification that the deadline was being extended, which is why <\/span><b>there is reasonable doubt that he committed two criminal offences;<\/b><\/li>\n<li><span style=\"font-weight: 400;\">The Ministry of Environmental Protection rejected the environmental impact assessment screening request of the Old Sava Bridge demolition, incorrectly stating that the procedure had already been carried out;<\/span><\/li>\n<li><span style=\"font-weight: 400;\">The Ministry of Construction, Transport and Infrastructure issued unlawfully, <\/span><b>based on an invalid decision<\/b><span style=\"font-weight: 400;\"> on the EIA approval, a permit for the construction of the new bridge.<\/span><\/li>\n<\/ol>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-bb51706 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"bb51706\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-extended\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-92a2665 sc_layouts_column_icons_position_left\" data-id=\"92a2665\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-eca96d8 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"eca96d8\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">\u201cThe legal validity period of the decision on the approval that expired cannot be extended by an informal notification from the Ministry, outside of the legal procedure. After the EIA expires, the investor is obliged to submit to the Ministry of Environmental Protection a formal request for the preparation of a new study or for an update of the existing impact assessment study.\u201d explains Ljubica Vuk\u010devi\u0107, RERI\u2019s attorney. \u201cFor this reason, we have submitted to the Government of the Republic of Serbia a request for the annulment of the illegal permit for the demolition of the old bridge with a proposal to order an interim measure, which would prohibit the investor from demolition until the decision on the request for the annulment is issued. Also, we notified the competent Prosecutor\u2019s Office and the inspection authority of the Ministry of Environmental Protection requesting that the investor be prohibited from demolition work on the old bridge until obtaining approval of the impact assessment study, and at the same time we demanded from the competent Prosecutor\u2019s Office to initiate proceedings against the civil servant from the Ministry of Environmental Protection who gave incorrect information to the investor that the EIA approval for the new bridge is still valid, thereby committing two criminal offences \u2013 falsifying an official document and misconduct in public office.\u201d<\/span><\/p><p><span style=\"font-weight: 400;\">The laws of the Republic of Serbia <\/span><i><span style=\"font-weight: 400;\">that are still in force<\/span><\/i><span style=\"font-weight: 400;\">, oblige the competent authorities which we have addressed, to remove without delay all illegalities related to the demolition of the Old Sava Bridge as well as to order the cessation of all illegal acts that cause justified citizens\u2019 concern. RERI hereby expresses its deepest concern for the legal order and legal certainty in the Republic of Serbia upon witnessing the highest state authorities are carrying out illegal acts while being protected by police cordons.<\/span><\/p><p><span style=\"font-weight: 400;\">Provided that the competent authorities which RERI addressed in this case act pursuant to the law and their duties, they can protect the legal order and prevent the collapse of the rule of law in the Republic of Serbia.<\/span><\/p><p><span style=\"font-weight: 400;\">The documentation referred to in this text is available at <a href=\"https:\/\/reri.org.rs\/wp-content\/uploads\/2024\/11\/Dokumentacija-Stari-savski-most.pdf\">THIS LINK.<\/a><\/span><\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>The removal of the Old Sava Bridge, which causes great dissatisfaction among citizens, is being carried out without an environmental\u2026<\/p>\n","protected":false},"author":50,"featured_media":13404,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_EventAllDay":false,"_EventTimezone":"","_EventStartDate":"","_EventEndDate":"","_EventStartDateUTC":"","_EventEndDateUTC":"","_EventShowMap":false,"_EventShowMapLink":false,"_EventURL":"","_EventCost":"","_EventCostDescription":"","_EventCurrencySymbol":"","_EventCurrencyCode":"","_EventCurrencyPosition":"","_EventDateTimeSeparator":"","_EventTimeRangeSeparator":"","_EventOrganizerID":[],"_EventVenueID":[],"_OrganizerEmail":"","_OrganizerPhone":"","_OrganizerWebsite":"","_VenueAddress":"","_VenueCity":"","_VenueCountry":"","_VenueProvince":"","_VenueState":"","_VenueZip":"","_VenuePhone":"","_VenueURL":"","_VenueStateProvince":"","_VenueLat":"","_VenueLng":"","_VenueShowMap":false,"_VenueShowMapLink":false,"footnotes":""},"categories":[1545,1550],"tags":[1890,1893,1892,1678,1891],"acf":[],"_links":{"self":[{"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/posts\/13707"}],"collection":[{"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/users\/50"}],"replies":[{"embeddable":true,"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/comments?post=13707"}],"version-history":[{"count":10,"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/posts\/13707\/revisions"}],"predecessor-version":[{"id":13719,"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/posts\/13707\/revisions\/13719"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/media\/13404"}],"wp:attachment":[{"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/media?parent=13707"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/categories?post=13707"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/tags?post=13707"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}