{"id":14877,"date":"2026-05-25T16:54:12","date_gmt":"2026-05-25T15:54:12","guid":{"rendered":"https:\/\/reri.org.rs\/prosecutor-dismisses-complaint-against-eps-for-operating-without-ippc-permits\/"},"modified":"2026-05-25T17:22:42","modified_gmt":"2026-05-25T16:22:42","slug":"prosecutor-dismisses-complaint-against-eps-for-operating-without-ippc-permits","status":"publish","type":"post","link":"https:\/\/reri.org.rs\/en\/prosecutor-dismisses-complaint-against-eps-for-operating-without-ippc-permits\/","title":{"rendered":"Prosecutor Dismisses Complaint Against EPS for Operating Without IPPC Permits"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"14877\" class=\"elementor elementor-14877 elementor-14870\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-90b5edb elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"90b5edb\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-extended\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-3ce3083 sc_layouts_column_icons_position_left\" data-id=\"3ce3083\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-87c3e14 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"87c3e14\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Despite clear evidence that key energy facilities in Serbia have been operating for years without integrated permits (IPPC permits), the First Basic Public Prosecutor\u2019s Office in Belgrade has once again issued a decision dismissing RERI\u2019s complaint alleging economic offence, against the Joint Stock Company Elektroprivreda Srbije (EPS) and the responsible individuals.<\/span><\/p>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-0b5539f elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"0b5539f\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-extended\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-f47d61d sc_layouts_column_icons_position_left\" data-id=\"f47d61d\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-87717d4 sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"87717d4\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t<h5 class=\"elementor-heading-title elementor-size-default\">Operating Without Permits Beyond the Statutory Deadline<\/h5>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-95bd7b0 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"95bd7b0\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-extended\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-90a8513 sc_layouts_column_icons_position_left\" data-id=\"90a8513\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-d3ee1c5 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"d3ee1c5\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Under the law, thermal power plants Kostolac A, Nikola Tesla A and B, as well as the Vreoci Kolubara Processing heating plant, operated by EPS, <\/span><b>were required to obtain integrated permits by the end of 2024<\/b><span style=\"font-weight: 400;\">. These permits comprehensively regulate the operating conditions of large industrial installations and activities that may adversely affect human health or the environment, including emission controls, environmental protection measures, monitoring, supervision and other matters relevant to the prevention and control of environmental pollution.<\/span><\/p>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-dc85bee sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"dc85bee\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">In addition to the facilities listed above, the complaint also concerned the Morava and Kolubara thermal power plants, which, although omitted from the latest publicly available list published by the Ministry, fall under the same legal regime pursuant to the law. We specifically emphasized that the use of the so-called \u201copt-out\u201d regime under which these two thermal power plants operate, did not constitute a permanent exemption from the obligation to obtain integrated permits. On the contrary, the regime merely allowed for a limited continuation of operations until the expiry of 20,000 operating hours, while these facilities continued operating even after that limit had been exceeded, justified by the need to preserve energy stability.<\/span><\/p>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f473336 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"f473336\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">RERI first filed a complaint in 2021 regarding the operation of these thermal power plants without integrated permits, noting that the deadline for obtaining such permits had expired on 31 December 2020. That complaint was dismissed after legislative amendments adopted at the end of 2021 extended the deadline for obtaining integrated permits until the end of 2024. It is important to note that EPS had already submitted applications for integrated permits for certain facilities back in 2013. However, after the Ministry of Environmental Protection requested additional documentation, there was no substantive progress in those procedures<\/span><b> for more than seven years<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-dd49c16 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"dd49c16\" data-element_type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-extended\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2871b39 sc_layouts_column_icons_position_left\" data-id=\"2871b39\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-5958041 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"5958041\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">The most recent decision dismissing the complaint indicates that EPS submitted new applications for certain facilities only at the end of 2023 and the beginning of 2024. Subsequently, the Ministry took months to request clarification from EPS on technical matters, specifically whether the submitted applications should be treated as new applications or as replacements for previously submitted ones. The Ministry then requested additional documentation, while EPS simultaneously sought extensions of the deadlines in order to gather all relevant documents adjacent to the application. As a result, the procedures continued throughout 2025, despite the fact that the statutory deadline for obtaining the permits expired on 31 December 2024.<\/span><\/p>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-1fa8d80 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"1fa8d80\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-extended\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-1f40e8f sc_layouts_column_icons_position_left\" data-id=\"1f40e8f\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-ccc6ed6 sc_fly_static elementor-widget elementor-widget-heading\" data-id=\"ccc6ed6\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t<h5 class=\"elementor-heading-title elementor-size-default\">\u201cComplicated Procedures\u201d Instead of Accountability \u2014 No One Responsible?<\/h5>\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-b570516 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"b570516\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-extended\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-bec4bc3 sc_layouts_column_icons_position_left\" data-id=\"bec4bc3\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-91654af sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"91654af\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">The Prosecutor\u2019s decision suggests that the Ministry of Environmental Protection has, for years, maintained these procedures in a state of administrative limbo. The fact that integrated permits for certain facilities<\/span><b> have not been issued for more than a decade was not regarded by the Prosecutor\u2019s Office as evidence of a serious failure in the implementation of the law, but rather as a consequence of \u201ccomplicated procedures.\u201d<\/b><span style=\"font-weight: 400;\"> Instead of such circumstances serving as grounds for establishing responsibility, they have effectively been normalized and treated as standard institutional practice.<\/span><\/p>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-13f91dc elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"13f91dc\" data-element_type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-extended\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-2c9f5e7 sc_layouts_column_icons_position_left\" data-id=\"2c9f5e7\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-125ef9f sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"125ef9f\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">The Prosecutor\u2019s Office relied precisely on this institutional inefficiency as grounds for dismissing the complaint, referring to the statement of EPS\u2019s General Director that the Ministry had requested additional documentation, that the procedures were ongoing, and that he \u201ccould not specify who might be responsible for a potential economic offence.\u201d Nevertheless, while citizens continue to inhale harmful by-products emitted by thermal power plants, <\/span><b>the Prosecutor\u2019s Office found no basis for an <\/b><b><i>ex officio <\/i><\/b><b>investigation of<\/b> <b>the responsibility for the fact that major energy facilities have been operating for years without permits explicitly required by law.<\/b><\/p>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-752819b elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"752819b\" data-element_type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-extended\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-4a382af sc_layouts_column_icons_position_left\" data-id=\"4a382af\" data-element_type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-c44f581 sc_fly_static elementor-widget elementor-widget-text-editor\" data-id=\"c44f581\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">Such a decision sends a dangerous message that in Serbia, the compliance with standards of protection of the environment and public health is optional, and that administrative procedures intended to ensure the enforcement of the law may instead serve for years as a shield against accountability for unlawful operation of industrial facilities \u2013 all under the pretext that \u201cthe procedure is still ongoing\u201d and \u201cone more document is missing.\u201d<\/span><\/p>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Despite clear evidence that key energy facilities in Serbia have been operating for years without integrated permits (IPPC permits), the\u2026<\/p>\n","protected":false},"author":50,"featured_media":14879,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_EventAllDay":false,"_EventTimezone":"","_EventStartDate":"","_EventEndDate":"","_EventStartDateUTC":"","_EventEndDateUTC":"","_EventShowMap":false,"_EventShowMapLink":false,"_EventURL":"","_EventCost":"","_EventCostDescription":"","_EventCurrencySymbol":"","_EventCurrencyCode":"","_EventCurrencyPosition":"","_EventDateTimeSeparator":"","_EventTimeRangeSeparator":"","_EventOrganizerID":[],"_EventVenueID":[],"_OrganizerEmail":"","_OrganizerPhone":"","_OrganizerWebsite":"","_VenueAddress":"","_VenueCity":"","_VenueCountry":"","_VenueProvince":"","_VenueState":"","_VenueZip":"","_VenuePhone":"","_VenueURL":"","_VenueStateProvince":"","_VenueLat":"","_VenueLng":"","_VenueShowMap":false,"_VenueShowMapLink":false,"footnotes":""},"categories":[1545],"tags":[2031,2033,2032],"acf":[],"_links":{"self":[{"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/posts\/14877"}],"collection":[{"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/users\/50"}],"replies":[{"embeddable":true,"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/comments?post=14877"}],"version-history":[{"count":1,"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/posts\/14877\/revisions"}],"predecessor-version":[{"id":14878,"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/posts\/14877\/revisions\/14878"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/media\/14879"}],"wp:attachment":[{"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/media?parent=14877"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/categories?post=14877"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/reri.org.rs\/en\/wp-json\/wp\/v2\/tags?post=14877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}